排行榜信息五月丁香社区_2021亚洲男人在线天堂_AV无码天堂资源网_人碰人摸人爱免费视频2015

Hydrolyzed pan waste steam dealing process


Summary

The discharge pressure of hydrolyzed is 0.2MPa, the Moisture in furfural scraps is steamed instantly, the process collect waste steam by draught fan and then condensate ,wash and recycle part of furfural in waste steam, and eliminate waste residue flash steam when discharging to improve the production environment.

Second, the process flow chart:blob.png

Service hotline: 0538-3399066;0538-3393566;0538-3393266

Fax: 0538-3399066

Zip code: 271600

Address: Feicheng High-tech Industrial Development Zone, Shandong Province




2022 Shandong Jinta Machinery Group Co., Ltd. All rights reserved. 




技術(shù)支持:掘金科技

WeChat

WeChat

WeChat

WeChat

Wechat

Wechat